CASE STUDY

Gulfstream Aerospace
Service Center 

Stats.

Market Sector: Aviation
872 CY Foundations 
163,361 SF SOG 11”/8”/6”  
47,132 SF Tilt Up Panels with 3 Month Brace Rental Included 
1 Dock Pits 
1 EA Drive in Truck Ramps 
1,445 LF Trench Drain and Small Drain pits 

Project Manager: Victor Maldonado
Superintendent: John Ploch
Foreman: Tayler Reinke
Tenant/Owner: E.E. Reed Construction/Gulfstream   
Developer: Smyrna Ready Mix Company

Synopsis

Service Center East, Phase 2 - T&T Construction Management Group commenced on this project in April 2023. As this is a hanger building, one of the challenges is the hanger door rails must be installed precisely to allow the main doors to move freely. 

The other challenge was a shared tilt wall running through the building, which required a more detailed and calculated approach in providing a safe and clear crane path to allow coordinated work with the other tradespersons on the project.  

Synopsis

The Rockefeller Group Logistics Center Eastampton is located on a 27.64-acre parcel on Route 206, approximately eight miles from Exit 7 of the New Jersey Turnpike. This 345,600 SF Class-A site plan includes 96 trailer spaces, 384 auto parking spaces, and a 185’ truck court with a 60’ concrete apron.  The state-of-the-art facility includes 54 dock doors with two drive-in doors, 36’ clear height, and 4,000 SF of office space.  

This project’s design incorporates wide-open clerestory entryways with imposing overhanging concrete panels tied to the steel structure. This unique feature demanded an intimate and careful coordination between the steel structure trade and the tilt panel construction to bring to fruition. In addition, the slab on grade made use of synthetic fiber-reinforced concrete, which allowed us to reduce the number of control joints in the concrete slab and create a more durable product for the customer. The architectural concrete steps and ramps at the office entrance were new details that pushed the boundaries of the aesthetic work we deliver. 

In February 2023, the Rockefeller Group sold the building to Glendale Warehouse and Distribution Corp. for $83 million. The project drew significant interest from both local and national users during the core and shell construction, but the Rockefeller Group was excited to sell it to Glendale, a user-buyer who was purchasing a new, Class A distribution center in one of New Jersey’s fastest growing industrial markets, Burlington County. 

The project’s proximity to the New Jersey Turnpike made it ideal for tenants looking to reach a large number of customers. Burlington County has become a core market for users, developers and owners driven by its accessibility to New York and New Jersey ports, South Jersey, and Philadelphia.  

T&T Construction Management Group is proud to be able to participate in and deliver this great project within schedule and abounding quality details for our repeat customer Blue Rock Construction, Inc. 